Miles I hear u but projects like this aren’t so much about money but the feeling of accomplishment when u get it done and it’s right. This one was more stressful as I had everything together right only to find additional parts to relieve more pressure were needed which meant I had to take apart half of what I had just done. I estimate the water must have been coming in at 130 140 at the main, where I measured at the sink was around 105 or so. I couldn’t measure pressure right at the main.
Anyway, this time all I did was touch the connection to feel for a leak. Such a simple one second turn of the fingers created this pain in the ass. Worse thing is Fenster does not give one shit I have splinters, even if I get a massive infection and die a slow horrible death. If fenster cared I think this burden would be easier to carry.


Thanks:
Likes:
Dislikes: 

Reply With Quote
Bookmarks